· · ⏱ 5 min read · Strategy and the future

Digital transformation: the roadmap that actually gets executed

Why most digital transformation plans fail in Colombian companies and how to build one in phases that the team can sustain.

Digital transformation: the roadmap that actually gets executed
cb

By Carlos Betancur Gálvez

Digital Marketing, Medical Marketing & AI Consultant · btodigital

Digital transformation almost always fails for the same reason: technology gets bought before the process changes. The tool arrives, nobody changes how they work, and six months later the conclusion is that “the system did not work”.

I have accompanied enough of these projects in Colombia to say that the software is almost never the problem.

What is it exactly, and what is it not?

It is not buying software. It is not having social media. It is not a new website.

It is changing how the business operates using digital tools, and measuring it. If nobody works differently at the end of the project, there was no transformation: there was a purchase.

What people call digital transformationWhat it actually is
Buying a CRMThe team recording and using the information
Having a websiteThe site generating and handling demand
Deploying a chatbotService improving, measurably
Digitising paper formsThe process having fewer steps, not the same ones on screen

That last row is the most frequent trap: turning a paper form into a PDF and calling it transformation.

Where do you start?

With the diagnosis, and specifically with three questions:

  1. Where is the most time lost today? Ask the team, not management. The answers tend to surprise.
  2. What information do you need to decide and do not have to hand?
  3. What falls apart when one particular person is away? That is the process living inside somebody’s head.

With those three answers you have your candidate list. Next comes choosing one, not all of them.

How are the phases ordered?

PhaseWhat happensDurationSignal you can move on
1. DiagnosisUnderstand processes and where it hurts2 to 4 weeksYou have a prioritised list
2. PilotOne process, one small team4 to 8 weeksIt works and the team prefers it
3. MeasurementCompare against the before2 weeksThere is a number that improved
4. RolloutExtend to the restMonthsUsage holds without pushing
5. Next processStart again

Phase 3 is the one most often skipped and the one that decides whether the project survives a change of priorities. Without a baseline, every later discussion is about opinions.

Why do projects get abandoned?

For these five reasons, in order of frequency:

  • Starting too big. Replacing the company-wide ERP as a first project is close to a guaranteed failure.
  • No owner. If it is everyone’s responsibility, it is nobody’s.
  • Nobody measured the before. So improvement cannot be demonstrated.
  • The team was not trained. The tool arrived and was assumed to be intuitive.
  • The incentive did not change. If people are still evaluated on the old thing, they will keep doing the old thing.

The last is the most invisible and the most decisive.

What role does AI play now?

It has dramatically lowered the cost of automating tasks that used to require custom development: classifying emails, summarising calls, answering repeated questions, extracting data from documents.

That makes small projects worth doing that previously were not. An agent handling frequently asked questions on WhatsApp can cost a few dollars a month in infrastructure and save hours daily.

But the order does not change: process first, tool second. Automating a bad process produces a bad process faster.

Frequently asked questions

What is digital transformation in a company? Changing how the business operates using digital tools, and measuring the change. If nobody works differently when it ends, there was no transformation: there was a software purchase.

Where should a small company start? With the process where the most time is lost today, as a small pilot, with a baseline number so you can compare. Never by replacing the company’s core system.

What does it cost? It depends far more on scope than on technology. A contained pilot with existing tools can cost little today; what is expensive is the time of whoever designs it and supports the team.

How long before results show? A well-scoped pilot should show something in two or three months. If a project shows nothing in six, review it before investing further.

Why do so many projects fail? Starting too big, having no owner, not measuring the starting point, not training the team, and not changing incentives. Almost never the technology.

Do I need to hire someone external? Not always. It helps when the internal team is too close to the problem to see it, or when experience with this kind of project is missing. What does not work is hiring someone and walking away.

Does AI change the roadmap? It changes what is feasible, not the order. Small automations that were not justified before now are, but the rule of fixing the process before automating it still governs.

Share X (Twitter) LinkedIn WhatsApp
Related posts